Severity: Notice
Message: Trying to access array offset on value of type null
Filename: Frontend/Noticias.php
Line Number: 24
Backtrace:
File: /home2/ecoair/public_html/application/controllers/Frontend/Noticias.php
Line: 24
Function: _error_handler
File: /home2/ecoair/public_html/index.php
Line: 315
Function: require_once
With its own manufacturing equipment, this system complies with the highest world class standards both in the design and in the automation of its operation.
April 2014 - With an installed capacity of 316 MW, this plant was built in 48 months, uses 3 turbines and will be able to supply 3% of SIC. For this, it requires an adequate ventilation system that keeps people and equipment productive, distributed in 4 levels underground, in an optimal work environment.